원문정보
On the Improvement of Facility to Performance Evaluation and Security of Safety through the Application of AHP Method in Railroad Signal Control System
초록
영어
The railroad facilities are intended for long-term operation as the initial acquisition costs necessary for infrastructure construction are high. Therefore, regular maintenance of railroad facilities is essential, and furthermore, system reliability through systematic performance evaluation is required. In this study, the signal control system of railroad electrical equipment was selected as the subject of research and the performance evaluation target facility selection study was conducted using AHP. The results of the study can contribute to the reliability of the signal control system as well as to the reliability of the railroad system, which is a higher system.
목차
1. 서론
1.1 연구배경 및 필요성
1.2 철도 시설 노후화 현황
1.3 AHP 활용의 적합성 판단
1.4 논문 구성 및 흐름
2. AHP를 활용한 성능평가 수행
2.1 철도 시설물의 성능평가
2.2 기존 내역 검토 및 추가 항목 선정
2.3 대상설비 가중치 산정 절차
2.4 대상설비 선정 기준을 반영한 AHP 수행
3. 추가 대상설비 항목 도출
4. 결론
5. References