원문정보
초록
영어
Today, Precision Guided Missile(PGM) Systems have key roles in both stragetic, tactical purpose and war deterrence in modernized warfares. PGM Systems have more complicated structures composed of machinery, electronics and sensors, hydraulics, and explosives. As the time goes by, PGM Systems gradually degraded performance in operational availability and reliability, therefore, the maintenance should be needed more and more. In order to extend the total operational life and increase the performance of missile systems, the depot maintenance should be executed in time. When the Depot Maintenance executed effectively, we can operate a good performance PGM almost the same level of newly product. The Depot Maintenance gives a policy decision maker to conclude reasonable and various counter measures such as a necessity of more powerful and effective PGM, flexibility to reorganize the missile strength, total operational life and the time of demilitarization, etc. On the contrary that existing studies usually focused on cost analysis, maintenance source, period, we suggest a standardized the Depot Maintenance Project Management System by using PPBEES, that will leads to effectively adapt to other Depot Maintenance Project.
한국어
오늘날 정밀유도무기체계는 전략적 목적 달성은 물론, 전쟁억지력에도 핵심적인 역할을 수행하고 있다. 정밀유도무기체계는 기계 및 유압, 전자 및 센서, 화학물질로 구성된 복합 무기체계로서, 일정한 시간이 경과하면 무기체계의 운용가용도 및 신뢰도가 감소하고, 정 비소요가 증가한다. 무기체계의 운용기간동안 저하된 성능을 향상시키기 위하여 창정비를 수행한다. 창정비를 효과적으로 수행시 신품에 준하는 성능을 발휘할 수 있고, 보다 향상 된 전투준비태세를 보장할 수 있다. 또한, 전력증강 정책결정자에게는 성능이 향상된 정밀 유도무기체계에 대한 전력화 필요성과 유도무기체계의 전력구조 재편성, 총 운용수명 및 비군사화 시점 등에 대한 합리적이고 다양한 방책을 제공한다. 기존 논문들이 대부분 군수 분야 현안인 비용분석, 창정비원, 주기 등이 주로 다루어 졌으나, 본 논문에서는 전력의 시 각에서 국방기획관리제도인 PPBEES를 적용한 창정비 개발의 표준화된 사업관리 절차를 제시함으로써 향후 수행될 창정비 개발사업에 효과적으로 활용될 수 있다.
목차
초록
Ⅰ. 서론
1. 연구의 배경과 목적
2. 이론적 고찰
Ⅱ. 유도무기체계의 정비 특성
1. 무기체계 관리 개념 변화
2. 정비 요소 및 정비 단계
3. 창정비 개념
Ⅲ. 유도무기체계 창정비 개발
1. 창정비 요소 개발
2. 창정비 개발 시 고려사항
Ⅳ. 창정비 개발 사업추진 절차
1. 사업 추진
Ⅴ. 결론
참고문헌