효과적인 라스트 플래너 운용을 위한 작업제약요건에 관한 연구

원문정보

Study on Constraint Factors for an Effective Last Planner Implementation

한정훈, 이로나, 정지현, 김대영, 이학기

피인용수 : 0(자료제공 : 네이버학술정보)

초록

영어

The object of construction project management is to achieve planned quality by adequate cost and schedule of the project, thus the effective time management is a critical factor to actualize the object. But the traditional time management by using milestone has several limitations which are not sufficiently considered mutual relation and variated from the task. In other words, applying the concept and principles of Lean Construction to the project shall be the best
way to not only reduce waste and variation, but also improve the productivity and ability to overcome limitation as mentioned above. Thus, this study proposes specific and systematic time management through introduction of management method of lean construction. The study, Last Planner System, specially focuses on constraint analysis which is used in Lookahead planning system. Consequently, this study presents constraint analysis able to improve reliability of work and Percent Plan Complete by controlling major factors of project before the planning phase.

목차

Abstract
 1. 서론
  1.1 연구의 배경 및 목적
  1.2 연구의 범위 및 방법
 2. 이론적 고찰
  2.1 CPM(Critical Path Method)
  2.2 라스트 플래너 시스템
  2.3 주단위예상작업계획의 작업제약요건분석
 3. 작업제약요건 도출 및 재구성
  (1) 작업흐름
  (2) 프로세스
  (3) 인적자원
 4. 결론
 참고문헌

저자정보

  • 한정훈 Han, Jung-Hun. 동아대 대학원 석사과정
  • 이로나 Lee, Ro-Na. 동아대 대학원 박사과정
  • 정지현 Jung, Ji-Hyun. 동아대 대학원 박사과정
  • 김대영 Kim, Dea-Young. 경남대 건축공학 조교수, 공학박사
  • 이학기 Lee, Hak-Ki. 동아대 건축학부 교수, 공학박사

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 기관로그인 시 무료 이용이 가능합니다.
      ※ 학술발표대회집, 워크숍 자료집 중 4페이지 이내 논문은 '요약'만 제공되는 경우가 있으니, 구매 전에 간행물명, 페이지 수 확인 부탁 드립니다.

      • 4,000원

      0개의 논문이 장바구니에 담겼습니다.