A Study of the Evaluating and Improving Methods on PMIS for Efficient Recognition of Knowledge Based on Process in Construction Phase.
초록
영어
The objectives of this study are 1)to evaluate PMIS with quality of connections and services among construction processes ,design modeling (eg: architectural, structural, mechanical, and electronic modeling), and documents (eg: specifications, contract document etc), 2)to develop prototype of repository system, for managing interrelations about improved PMIS processes, output of process with evaluations and improvements, These improvements enable 1)construction planning with valid and latest informations, about method of construction, estimation, schedule planning information, budget planning through existing knowledge at the phase of design, 2)and providing to the point, informations and knowledges of each execution processes (such as construction planning/architectural structures/facilities/electrical systems at the phase of execution).
목차
1.1 연구의 배경 및 목적
1.2 연구의 범위 및 방법
2. 예비적고찰
2.1 기존연구문헌 고찰
2.2 설계정보활용의 실무현황
2.3 문헌 및 실무현황고찰을 통한 시사점
3. 시공단계 PMIS의 지식활용 평가 방법론의 적용
3.1 프로세스와 지식의 연계기반 구축
3.2 시공단계의 지식인식기반 PMIS 평가요소
3.3 PMIS 평가 및 개선사항 도출
3.4 PMIS 평가내용을 반영한 개선수행
4 프로세스/지식통합 Repository System 구축
4.1 시스템구축의 필요성
4.2 시스템구축의 절차
4.3 시스템 개발
5. 결론
참고문헌