원문정보
A Study on the Analysis of Construction Planning & Scheduling in the Similar Case related Long-life Housing - Focused on the FPWS(Flat Plate Wall System) Multi-Family Housing -
초록
영어
The purpose of this study is to provide the basic data for construction planning & scheduling in the similar case related Long-life housing through the survey and analyzation of construction planning & scheduling in the similar case related Long-life housing(A) and existing wall structural case(B). The method and contents of the study are shown as follow. The survey carried out to find the president condition of construction planning & scheduling, and arranged 1 cycle process of the structural construction in each case. Finally, In the study compared a basic construction planning & scheduling of (A) case with (B) case provided improvements for the problem of the work and planning & scheduling process which become known from investigation
and analytical process.
목차
1. 서 론
1.1 연구의 배경 및 목적
1.2 연구의 범위 및 방법
2. 장수명 공동주택 건축의 공정관리에 관한 고찰
2.1 공정관리의 개념
2.2 공동주택구조시스템 변천과 복합무량벽체구조시스템의 개념
3. 기존 벽식 및 장수명 공동주택 유사사례 현장 조사
3.1 조사 개요
3.2 기존 벽식 공동주택 구조체 1cycle 공정 현황
3.3 장수명 공동주택 유사사례 구조체 1cycle 공정현황
4. 기존 벽식 및 장수명 공동주택 유사사례 공정 분석
4.1 주요 공종의 생산성 및 공정 분석
4.2 공정분석에 대한 개선 방안
5. 결론
참고문헌