원문정보
Problem and Solution through the Domestic Construction Management Project Analysis - Focused on the Case Project of Cultural Welfare Hall in Seoul D City-
초록
영어
The domestic construction industry confused a definition, role and effectiveness of the CM. Because it lacks a systematic and deep research in the introduction process. Also it lacks a sufficient benchmarking with an advanced country. Therefore if we make a solution and analyze a problem through the CM application case, the domestic CM growth will be activated. As a method of research, we investigated a limit factor of the CM activation and case of the CM application. We plan to analyze the feature, organization and range of business in the newly builded D cultural welfare hall. Then we will find a problem and present a solution for domestic settling of the CM. As a result of research, we presented a solution of problem that occurred in placing an order, contact, design, approval, permission and construction. Because the project is the showing project if it is improved and supported systematically, it will be the good management model of construction industry and be a meaningful project in the future.
목차
1. 서론
1.1 연구배경 및 목적
1.2 연구의 범위 및 방법
2. 이론적 고찰
2.1 국내 CM활성화의 제약요소
2.2 CM적용사례 분석
3. D동 문화복지회관 CM
3.1 공사개요
3.2 발주방식
3.3 과업수행범위
3.4 설계단계 CM업무
3.5 시공단계
4. 문제점 및 개선방향
5. 결론
참고문헌