PMIS 적용사례분석 및 발전방안 - D지하철 현장 사례를 중심으로 -

원문정보

Example Analysis and Development of Project Management Information System - Case Study of Subway Construction in D. Area -

김진규, 주덕종, 김옥교

피인용수 : 0(자료제공 : 네이버학술정보)

초록

영어

Recently, The huge impact of Information Technology adoption have made great changes in large parts of industries.
Therefore, construction companies are trying to enhance productivity and to raise their competitiveness in the market by adopting information technology(IT). To this end, it is essential to develop a appropriate planning methodology for PMIS(Project Management Information System) in construction field. The purpose of this research is to suggest the systematic methods of evaluating the construction companies' information systems and establishing a long-term
information strategy. The major results of this research are summarized as follows : we need to introduced PMIS, ASP, any other solutions, and its use on this study. And also, in IT policy side, it is need to make information classification standards, integrated D/B system, construction CALS standards and any other criterion related with IT standards.

목차

Abstract
 1. 서론
  1.1 연구의 배경 및 목적
  1.2 연구의 범위 및 방법
 2. 문헌 고찰
  2.1 건설산업 정보화의 구조
  2.2 국내외의 PMIS 개발 현황과 사례분석
 3. D지하철 현장 사례분석
  3.1 발주청의 PMIS운영 요구사항 분석 및 운영효과
  3.2 PMIS 설계안 분석
  3.3 운영상 PMIS활용도 분석
  3.4 데이터 호환성여부 분석
  3.5 PMIS개선사항
 4. 국내 PMIS 발전방안
 5. 결론
 참고문헌

저자정보

  • 김진규 Kim, Jin Kyu. 정회원, 충북대 대학원 석사과정
  • 주덕종 Ju, Deok Jong. 정회원, 충북대 건축공학과 학부과정
  • 김옥교 Kim, Ok Kyue. 정회원, 충북대 건축공학과 교수, 공학박사