A Study to Estimate the Project Cost at Completion by Using Correlation Analysis in the Early Stage of the Project
초록
영어
The EAC(Estimate at Completion) among existing methods, which estimate cost and time effectively, help managers anticipate changeable several results at the point of 15~30% in the project progress. However, this method may cause such some problems as not to consider the periodically changing circumstances caused by construction risks or uncertainties which can affect the cost and time in the project, and to regard collected and accumulated data only as a
single value when predicting the results on the progress. Accordingly, it is very difficult to accept the even small range of variability based on the anticipation of EAC.
Consequently, the study focuses on the possibility methodology to anticipate time and cost accurately on the way to utilize EVMS(Earned Value Management System), and also suggest the way to perform the right estimation of EAC as considering various risks and uncertainties in construction projects.
목차
1. 서론
1.1 연구의 목적
1.2 연구의 범위 및 방법
2. EAC 측정 방법
2.1 기존 연구 현황
2.2 EAC 추정 방법
3. 회귀분석을 이용한 EAC 추정 방법
3.1 EVM에서 확률적 평가의 필요성
3.2 회귀분석을 이용한 EAC 예측 방법
4. 사례 연구
4.1 개요
4.2 성과측정
4.3 ACWP 및 BCWP 증감 회귀분석
4.4. EAC 추정
4.5 시점별 오차율
5. 결론