핵연료 노내조사시험설비 시공 및 시험

초록

영어

FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL construction work began on August, 2006 and ended on March, 2007.
During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. The Commissioning of the FTL is on due to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

목차

Abstract
 1. 서론
 2. 공사 내용
 3. 시공 전 준비 및 시공
 4. 시공 후 시험 내용
 5. 공사 후기 및 향후 계획
 6. 결론
 참고문헌

저자정보

  • 박국남 K. N. PARK. 한국원자력연구원, 하나로이용연구단
  • 지대영 D. Y. CHI. 한국원자력연구원, 하나로이용연구단
  • 이정영 C. Y. LEE. 한국원자력연구원, 하나로이용연구단
  • 안성호 S. H. AHN. 한국원자력연구원, 하나로이용연구단
  • 김학노 H. R. KIM. 한국원자력연구원, 하나로이용연구단
  • 김영진 Y. J. KIM. 한국원자력연구원, 하나로이용연구단
  • 유현재 H. J. YOO. 현대건설주식회사, 원자력사업단
  • 유성연 S. Y. YOO. 충남대학교, 기계설계공학과

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 기관로그인 시 무료 이용이 가능합니다.

      • 4,000원

      0개의 논문이 장바구니에 담겼습니다.