A Study on the Analysis Method of Change Order - Claim in Design-Build
초록
영어
The insistence of rights and interests in contract is being generalized by opening in construction market which is following F.T.A, internationally. Conditions of contract in construction have different specialities compared with other industries. Different conditions of contract should be established because of a specific character that is different from each construction, such as work, environment, circumference conditions. Although the order of Turn-key is being
expanded by increasing construction scale and demanding hybrid function, the suitable regulations of contract are not settled. As a result, various factors of claim is occurring in Change Order-Claim, because they just obey a part of guide-line. This study suggests useful analysis method in detail concerned with the main factor of Change Order-Claim by each D/B phases.
목차
1. 서론
1.1 연구의 배경 및 목적
1.2 연구범위 및 방법
2. Design-Build방식의 특성
2.1. D/B방식의 개요
2.2 D/B방식의 특성파악
2.3 D/B사업의 클레임
3. 설계변경 클레임요인의 도출 및 분류
3.1 국내사례조사 및 전문가 면담
4. 클레임요인의 중요도 분석
4.1 중요도 분석을 위한 계층구조의 구성
4.2 중요도 측정 및 척도
4.3 요인의 가중치 산정
5. 결론
참고문헌