원문정보
A Case Study on Risk Response Methods to Private Construction Projects in North Korea
초록
영어
Different from governmental/government-financed construction projects, private construction projects in North Korea are placed in a complex and specific circumstance, thus being involved with a lot of risks. In this vein, it is necessary to take measures to manage such risk factors, but not many private construction projects in North Korea have been carried out so far and data and
preceding studies on its risk management plans could be hardly found. Therefore, the purpose of this study was to examine the risks of private construction projects in North Korea and suggest some risk management plans through some examples. For this, the investigator interviewed with people who were working for constructors and their collaborators, and used data on the training
of government officials. Study findings are as follows: 1)from planning to completion, risk factors of construction projects in North Korea were analyzed and measures were presented, centering on the approval of construction, shipping of materials, visiting procedures, stays, on-site construction, and safety supervision. 2) since the risk factors of private construction projects in North Korea are quite different from those of general construction projects, it is necessary to talk over a contract with the said party in North Korea fully in advance. 3) since the construction projects in North Korea are carried out in a specific site with which regular contacts are impossible, thorough advanced preparation is a must in order not to face the risks of cost and time.
목차
1. 서론
1.1 연구의 배경 및 목적
1.2 연구의 방법 및 절차
1.3 선행연구 고찰
2. 이론적 고찰
2.1 건설공사의 위험과 불확실성
2.2 대북투자위험과 불확실성.5).6)
3 대북 건설공사의 유형 및 기회분석
3.1 대북 건설공사의 유형 및 특성
3.2 대북 민간 건설공사의 위험과 기회의 상호교환(Trade-Off)
4. 사례연구를 통한 위험분석
4.1 대상프로젝트 개요 및 내용
4.2 단계별 위험분석
4.3 단계별 위험대응방안
5. 결론
참고문헌