원문정보
A Study on the Analysis of Factors Decreasing Construction Labor-Productivity using AHP Method
초록
영어
Usually, processing whole project or a part of frame work delays due to acceleration, changing orders, management, characters of projects, overtime, worker crowding, early occupation in the field of construction. Through a whole project, these factors cause decreasing
construction labor-productivity which is the most dependent in business of construction. These kind of decreasing of construction labor-productivity cause many negative effects, just as extension of time, increasing cost in project of construction. Regardless of characters of construction or decreasing labor-productivity, extension of time is a incident which needs acceleration, also it cause a high possibility of claim and dispute.
The productivity has just a broad meaning in business of construction. That's why it's difficult to apply in the field of construction. Especially, factors increasing or decreasing labor-productivity is defined by analysis of working as qualitative and outlined evaluation. However, study of the each factor decreasing construction labor-productivity analysis has not researched, because of difficulty of systematic measurement and management. The existed studies about management of productivity are just focused on estimation of productivity, not on evaluation of productivity. It was true that I couldn't examine clearly about the analysis of how much important per each the factor which have influence on labor-productivity because of the characteristic as qualitative that the labor productivity have.
On this study, I tried to get the factors decreasing of labor-productivity with gathering opinions of panels of expert's studies about the factors decreasing of labor-productivity on project of construction through Delphi method and I evaluated the result factors as quantitatively and subjectively about importance of factors decreasing construction labor-productivity analysis, using AHP Method by Saaty. Also, using Delphi and AHP method, I suggest substantiated method qualitative factors are measured by quantitative criteria.
목차
1. 서론
1.1 연구의 배경 및 목적
1.2 연구 방법 및 내용
2. 이론적 고찰
2.1 노동생산성의 고찰
2.2 의사결정 분석기법의 고찰
3. 건설노동생산성 저하요인의 추출
3.1 노동생산성 저하요인
3.2 실증분석
4. 노동생산성 저하요인의 분석
4.1 계층구조의 구성
4.2 중요도 측정 및 척도
4.3 계층분석법(AHP)의 적용
4.4 노동생산성 저하요인별 가중치 산정
5. 의사결정 방법을 활용한 방법론의 검증
5.1 현장조사의 실시
5.2 방법의 검증
6. 결론
참고문헌