원문정보
A Study on the Life Cycle Cost Analysis of Primary Cooling System in Service Life
초록
영어
The purpose of this study is to suggest the life cycle cost analysis of primary cooling system in service life. During the life cycle cost analysis of primary cooling system, the project phases divided into planning/design, equipment construction, maintenance/management, and demolition/sell phases. and established cost items of each phases.
The main results are as follows;
(1) The result of capacity base LCC10~LCC20 of primary cooling system indicates that the absorption chiller-heater system for urban gas is better for less than 600USRT, and ice storage method is better for more than 600USRT.
(2) In the LCC10~LCC20 of primary cooling system, the order of the average rates in each phases indicates maintenance /management, equipment construction, planning/design, and demolition/sell phases.
(3) In the LCC10~LCC20 of primary cooling system, of the influence factor of service life indicates energy cost, water service and drainage cost, operation labor cost, maintenance cost, tax, fire insurance cost, initial interest cost, demolition labor cost, construction waste cost, sale and remain cost.
목차
1. 서론
2. 냉열원 시스템의 LCC 분석시 비용항목, 비용항목 변수, LCC 환상방법에 관한 이론적 고찰
2.1 비용항목
2.2 비용항목 변수
2.3 LCC 환산방법
3. LCC 분석을 위한 전제조건
4. 내용연수 변화에 의한 냉열원방식의 용량별 라이프사이클 코스트 분석, 프로젝트 진행단계별 비율
4.1 냉열원방식의 용량별 LCCn
4.2 냉열원 방식별 경제성 우선순위 변화
4.3 프로젝트 진행단계별 비율 및 비용항목 특성
4. 결론
참고문헌