영어

In order to analyze the impact of fine dust generated from a construction waste intermediate processing site on the surrounding areas, diverse types of samples were collected from inside the site and surrounding areas. The impact analysis results of samples are as follows. (1) Compared to the air quality management standards by the Ministry of Environment, the concentration of fine dust within the site was 30 to 46% for PM10 and 14 to 42% for PM2.5, which was not much different from the general air quality level. (2) It was found that PM10 within the site may have a partial effect on the air quality, but when the blocking facilities in the site, wheel washing facilities at vehicle entry and exit route, and sprinkler during working were maintained, the impact on the nearby area was not high. (3) In the case of PM2.5, its concentration was influenced more by the exhaust fumes from work vehicles than fine dust generated during construction waste processing. Since the PM2.5 concentrations in the site and surrounding area were not much different from the general air quality, there was little correlation with the work impact of construction waste intermediate processing sites. (4) Pb, an indicator of heavy metal components, was within 50ng/㎥ in all three sites, which was 10% of the domestic management standard and equivalent to the general air quality level. The complaints from residents in nearby areas were filed using indicators based on visual and experiential information in their daily lives, so even if the survey results of environmental impact by the construction intermediate waste processing site are lower than the standard, nearby residents can feel it better than such numerical information. Therefore, specific activities to reduce find dusts should be continuously continued.

목차

Abstract
1. 서론
2. 환경 영향 평가 방법
2.1 사업장 선정 및 특징
2.2 작업장 미세먼지 농도측정
2.3 인근 지역 미세먼지 농도측정
2.4 대기모델링
2.5 미세먼지 중 중금속 농도측정
2.6 SEM-EDX 입자 분석
3. 현장조사 결과 및 분석
3.1 발생원이 사업장 및 인근에 미치는 영향 평가
3.2 대기모델링 평가
3.3 중량법에 의한 24시간 대기농도 측정결과
3.4 중금속 분석결과
3.5 SEM-EDX 분석결과
4. 결론
참고문헌

저자정보

  • 장경필 Jang, Kyong-Pil. 한국건설기술연구원 건축연구본부 박사후연구원, 공학박사
  • 김병윤 Kim, Byung-Yun. 가톨릭관동대학교 건축공학과 교수, 공학박사

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 기관로그인 시 무료 이용이 가능합니다.

      • 4,000원

      0개의 논문이 장바구니에 담겼습니다.