원문정보
국내 전력계통의 송배전 용량의 부족에 따른 계통 영향 검토
초록
영어
The total domestic power generation capacity of the power system has been designed as the 10th power supply and demand plan with the goal of maximum of 234.3[GW] on a summer base. It would be planned to be installed generation thtat nuclear power generation was 31.7 [GW] (13.2 [%]) and renewable energy was 108.3 [GW] (45.3 [%]).. However, the power system has been operated the lack of transmission capacity for large-capacity power generation(nuclear and thermal power) for transported from the non-metropolitan area to the metropolitan area. Also, it would be increased the reliability of the system operation due to the nuclear power in that volatility problem of renewable power sources for the average annual load of 66.2[GW]. This state would be expected to reach about 160[TWh] and, need to other alternatives. This paper was considered to improve and operational alternatives the transmission capacity of power generation in the non-metropolitan area overlooked in the 10th power supply and demand plan.
한국어
국내 전력계통의 구조는 지방지역의 발전전력이 수도권으로 송배전되는 구조이다. 이에 10차 전력수급계 획에서 전력계통의 총 발전용량은 최대 234.3[GW]으로 설계되었다. 원자력발전은 31.7[GW](13.2[%]), 재생에너지 는 108.3[GW](45.7[%])을 차지한다. 그러나 대용량 발전전력(원자력, 화력)의 송전을 위한 비수도권에서 수도권으 로 수송하는 송전선로 용량은 부족하게 전력계통이 운영되고 있다. 또한, 연평균부하 66.2[GW]에 대한 신재생에너 지원의 변동성 문제에서 원자력이용을 통해 계통운영의 신뢰성 향상이 필요하다. 국내의 전력계통은 약 160[TWh]에 도달할 것으로 예상되며, 원활한 계통을 위해서는 다른 대안이 필요하다. 본 논문은 10차 전력수급계 획에서 간과된 비수도권 발전 송전용량을 개선하고 운영적 대안을 제시하기 위해 고려되었다.
목차
요약
Ⅰ. Introduction
Ⅱ. Body
2.1 Transmission line capacity
2.2 Case Study
Ⅲ. Conclusion
REFERENCES
