A study on the definition of factors affecting project performance in semiconductor factory construction by Fast-Track Method
초록
영어
The world is witnessing a stiffer competition in semiconductor industry. With each company looking to establish dominance in market, it has become important to build a semiconductor factory as fast as possible. The current technique adopted at site is 'Fast-Track', which is most common and helps shorten the construction period. However, this fast-track method results in an increase in cost from changes at the request of the owner and the interference demanded by a number of minor issues occurring at site, unlike the conventional method. In this study, factors to fast-track technique are defined and questionnaire on project's stakeholders is conducted, of which the result is statistically evaluated to give each factor a quantitative and influential weight. This study shows that fast track technique enables a semi-conductor construction to be completed on schedule and within budget, proving that project management by fast-track technique is reasonable and efficient.
목차
1. 서론
1.1 반도체 산업 특성
1.2 반도체 공장 건설 프로젝트 특성, Fast-Track 장단점
2. 연구 배경
2.1 프로젝트의 정의
2.2 프로젝트관리의 정의
2.3 건설 산업 정의 및 특성
2.4 Fast-Track 정의 및 장단점
2.5 Fast-Track 건설 방식 적용 사례
3. 연구 모델 및 방법론
3.1 연구 모델 설정
3.2 연구 가설 설정
3.3 변수의 정의
4. 분석
4.1 표본 선정 및 자료 분석 방법
4.2 인구 통계적 특성 분석
4.3 소속 집단 간의 통계적 차이 검증
4.4 탐색적 요인 분석을 통한 연구 모델 타당성 검증
4.5 연구 가설 검증
5. 결론
5.1 연구 결과 요약
5.2 연구 시사점 및 발전 방향 제시
5.3 연구의 한계점 및 향후 연구 방안
References
Appendix. 설문지