원문정보
Automation of BIM Conversion Through Matching Drawing and RDS
초록
영어
Recently, BIM has been widely applied to the AEC industry, but it has not been applied to the facility management realm. Since the largest energy is consumed in the operation stage of the building's life cycle, the application of BIM at this stage will save energy consumption. In South Korea, since 2016, a facilities management system (Edubuil) has been established to manage the school facilities by the Ministry of Education. Educational facilities are a group of facilities with high energy consumption, and conversion of conventional facility data to BIM can have a great effect on saving energy and reducing carbon emissions. In this study, an automation method for converting data from Edubuil into BIM was developed to create a building information model for facility management. The automation method consists of the following four modules: Space partition element creation module, RDS input module, window parameter creation module, window library construction module. The developed BIM conversion automation method shortened conversion time for converting school facility data into BIM compared to manual methods.
목차
1. 서론
1.1 연구 배경 및 목적
1.2 연구 방법과 대상
2. 학교 시설자료의 BIM 전환 자동화 개발
2.1 학교시설관리 자료
2.2 공간분할요소(벽, 바닥, 지붕) 생성
2.3 공간 객체와 RDS의 매칭과 데이터 입력
2.4 창호 파라미터 생성
2.5 창호 라이브러리 구축
2.6 창호 작성
3. 학교시설 BIM의 활용
3.1 기존 시설관리 자료 대체
3.2 창호 수량 및 물량 산출
3.3 에너지 시뮬레이션 수행
4. 결론
REFERENCES