This research explored methods for improvements to be made within the field of drone usage within the construction industry based on an investigation of factors which limit their efficiency and productivity. Limiting factors and improvement measures were presented in terms of technology, service, law and policy for employing drones at construction sites. Our first suggestion is, from a technical point of view, that companies need to expand professional manpower and infrastructure for systematic management. Second, in terms of service expansion, it is necessary to have management capabilities for operation such as the use of drones with enhanced safety and reinforced on-site education and personal information management. Third, in terms of legal and institutional support measures, it is necessary to prepare a plan for reforming the legal system for revitalization and to expand the training of professional manpower. This study may contribute not only to the development of drone technology, but also to effectively respond to various problems that appear at construction sites.
목차
1. Introduction
2. Theoretical Background
2.1 Drone Technology
2.2 Reasons for using Drones in Construction Sites
3. Application area example
3.1 Measurement with a 3D Laser Scanner
3.2 Construction Management Through on-site Photography
3.3 Building Aging Management
3.4 Operational Management such as Road and Canal Construction
4. Limitations of Drone Application in the Construction Industry and Improvement Plans
4.1 Limitations on the Application of Drones within the Construction Industry
4.2 Improvement
5. Conclusion
Acknowledgement
References