외관상태평가에 기초한 콘크리트 사방댐의 손상에 미치는 영향요인 분석
초록
영어
This study assesses the exterior condition of concrete check dams and analyses the factors such as the watershed area, check dam length, deposit length, and elapsed years which can affect the damage of concrete check dams. After the survey of 426 concrete check dams built in Gangwon province, we found that although all the factors have statistical significance, the elapsed year of construction is most closely related to the condition of the dams. In other words, the elapsed year is the most influential factor among the analysed ones; the watershed area(R=-0.121, p<0.05), dam length(R=-0.183, p<0.01), deposit length(R=-0.274, p<0.05), and elapsed years(R=-0.852, p<0.01). In addition, it is considered that the detailed inspection cycle of dams can be set as 15 years after construction because the assessing point less than 2.5 which indicates the need of urgent repair and reinforcement starts to appear after 15 years of construction. Since this study is limited to impermeable concrete dams, the supplementary research on dam types and materials is required.
한국어
사방댐의 손상유형 파악 및 향후 유지관리 방향을 도출하기 위해 강원도에 설치된 426기의 콘크리트 사방댐을 대상으로 종합 외관상태평가점수와 설계인자 및 시공 경과년수 등의 항목과 관련성을 분 석한 결과, 콘크리트 사방댐의 상태에 가장 밀접한 영향을 미치는 것은 경과년수인 것으로 파악되었 다. 즉, 콘크리트 사방댐의 집수면적(R=-0.121, p<0.05), 경과년수(R=-0.852, p<0.01), 사방댐의 길이 (R=-0.183, p<0.01), 저사길이(R=-0.274, p<0.05) 중에서 사방댐의 상태에 가장 영향을 주는 인자는 경과년수인 것으로 조사되었으므로, 콘크리트 사방댐 관리는 경과년수에 따라 정기적인 점검 및 보수⋅관리방안을 설정하는 방안을 검토할 수 있을 것으로 판단된다. 또한, 결함이 발생하여 긴급한 보수⋅보강이 필요한 2.5점 이하는 경과년수가 15년 이후 나타나기 시작하였으므로 사방댐의 정밀 점검 주기를 시공 후 15년 경과후로 설정할 수 있을 것으로 사료된다. 다만, 이 연구는 불투과형 콘크리트 사방댐만을 대상으로 하였으므로 향후 사방댐의 유형별, 재료별 보완 연구가 지속되어야 할 것으로 판단된다.
목차
Ⅰ. 서론
Ⅱ. 연구절차 및 방법
1. 연구절차
2. 연구대상
3. 현장조사
Ⅲ. 결과 및 고찰
1. 사방댐의 종합상태평가 점수 분포
2. 사방댐 설계인자에 따른 상태변화
3. 경과년수에 따른 사방댐의 상태변화
Ⅳ. 결론
감사의 글
Acknowledgement
References
국문초록