This study is significant in determining the reduction of safety accidents by applying PDCA's theory by subdividing it into a case analysis technique for construction sites by PDCA's theory. For this study, accidents accounted for the largest proportion of each type of disaster in the construction site were considered, and safety accidents were reduced through the PDCA theory through prior research. The analysis method of this study derived improvement plans by applying PDCA techniques to plan, implement, confirm, review, and improve disaster accidents at construction sites. The conclusions of this study are as follows. In the plan, first of all, measures shall be taken to prepare a safety management plan, to verify the implementation of the plan, and to verify the degree of implementation by the field manager. In the implementation, first of all, it is necessary to introduce a safety education history system to strengthen the safety education curriculum to suit the site, as long-term work is impossible for field workers depending on field conditions. First of all, it is necessary to strengthen the installation of safety facilities, including "work scaffolding" and "conducting prevention facilities" at construction sites. In management review and improvement, the risk assessment system for construction sites needs to be expanded first°.
목차
1. Introduction
1.1 Necessities
1.2 Preceding Researches
1.3 Differentiation from Preceding Researches
1.4 Objectives
2. PDCA Theory
2.1 Composition of PDCA Theory
2.2 Components of PDCA Theory
2.3 Necessity of PDCA Theory in Construction Sites
3. Actual Status of Disaster Accidents in Construction Sites
3.1 Establishment of a Plan
3.2 Execution
3.3 Checking
3.4 Manager’s Review & Improvement of Problems
4. Disaster Accident Improvement Measures by PDCA Theory
4.1 Establishment of a Plan
4.2 Execution
4.3 Checking
4.4 Manager’s Review & Improvement
5. Conclusions
References