원문정보
A Study on the Improvement for the Preliminary Review of Public Building Projects
초록
영어
The purpose of this study is to examine the current status and problems of the Preliminary Review of Public Building Projects and to propose alternatives. First, the problems of the preliminary review identified in this study can be summarized into three main categories. First, it is difficult to predict and reflect future changes in the plan due to the difficulty of forecasting the future. Second, it is difficult to reflect the demands of citizens as final consumers. Third, the cost and benefits of the project are not known. It is difficult to calculate the scope of the project budget and the hassle of having to re-evaluate the feasibility such as the existing preliminary feasibility study. This was confirmed through the survey results of public officials who prepare existing research and business plans. The alternative proposed by this study is preliminary research through the combination of scenario planning and non-market goods value estimation methodology. A scenario can be drawn up to take into account uncertain future changes, and a comprehensive analysis of the values, the reasons, the needs of citizens, and the scale of social benefits based on the proposed scenarios and public building plans. The alternatives analyzed in this way fit the intention of the preliminary review and will be a way to maximize the efficiency and effectiveness of the project.
목차
1. 서론
1.1. 연구의 배경과 목적
1.2 연구의 대상과 방법
2. 공공건축 사업계획 사전심사
2.1 공공건축 사업계획 사전검토의 목적과 개요
2.2 공공건축 사업계획 사전검토 업무지침
3. 공공건축 사업계획 사전심사의 문제점과 한계
3.1 공공건축 사업계획 사전심사 현황
3.2 공공건축 사업계획 사전심사의 문제점
4. 대안 검토 및 제시
4.1 구체적인 방법론
4.2 제도적 보완 방안
5. 결론
REFERENCES