Recently, construction work is complicated by high-rise, large-scale, complex and atypical and various uses of space, and industrial accidents are constantly occurring at construction sites due to high-altitude work. In particular, various accidents such as fall collision, contact, and collapse occur in temporary construction, and it is judged that a lot of work which requires considerable attention is included. Therefore, this study aims to examine the collapse disaster that has the greatest disaster intensity compared to the disaster condition. As the construction progresses, we will set up preventive measures through case analysis to prevent collapse disasters in temporary works and set up improvement plans by surveying the managers working at the site.
한국어
최근의 건설공사는 고층화, 대형화, 복잡화 및 비정형화와 더불어 공간의 다양한 활용으로 인해 작업이 복 잡해지고 있으며, 이에 따른 고소작업으로 건설현장에서의 산업재해가 끊임없이 발생하고 있다. 특히, 가설공사 내 에서도 추락 충돌 및 접촉, 무너짐(붕괴) 등의 다양한 재해가 발생되고 있어, 상당히 주의를 요하는 작업이 많이 포 함되어 있다고 판단된다. 따라서, 본 연구에서는 재해 상태에 비해 재해 강도가 가장 큰 무너짐(붕괴)재해에 대해 살펴보고자 한다. 공사를 진행하면서 가설공사에서의 무너짐(붕괴)재해 예방을 위해 사례분석을 통해 예방방안을 설정해보고 현장에서 근무하고 있는 관리자에 대해 설문을 통해 개선방안을 설정 해보고자한다.
목차
Abstract
1. 서론
1.1 연구의 목적
1.2 연구의 방법 및 절차
2. 이론적 고찰
2.1 가설공사 및 가설건축물의 정의
2.2 중대재해의 정의
2.3 선행연구 조사
2.4 건설현장 강관비계 조립상의 안전대책
3. 가설공사 안전사고 원인 및 사례조사
3.1 무너짐(붕괴)중대재해 사고 현황 및 분석
3.2 무너짐(붕괴)재해 사례조사
3.3 무너짐(붕괴)재해 사례 조사를 통한 안전관리 개선방안
3.4 가설공사 무너짐 재해에 대한 원인조사
4. 결론
REFERENCES