근로시간 단축에 따른 건축기술자의 근로실태 변화 및 요구사항 분석

원문정보

Analysis of Changes in Labor Conditions and Requirements among Construction Engineers Due to Working Time Reduction

김재엽, 임형은, 김백중

피인용수 : 0(자료제공 : 네이버학술정보)

초록

영어

In order to improve working environments, South Korea implemented a 52-hour workweek starting from July 1, 2018. However due to the characteristics of the construction industry in which workers do their duties in accordance with the construction process, it seems to be unreasonable to apply a general working time reduction system to the construction industry. In this regard, this study aims to analyze the countermeasures of various construction companies as well as construction engineers’ labor conditions and requirements after the enforcement of the working time reduction system. The research results showed that the working hours of construction engineers decreased slightly after the enforcement of the working time reduction system. Moreover, the construction companies responded to the working time reduction system by introducing various systems. The directions to become acquainted with the working time reduction system and methods to complement the reduction in workloads required by construction engineers were analyzed so as to establish the appropriate response to establish the working time reduction system in the future. The analysis found that in the case of the working time reduction system, the method of adjusting commute time, flexible work arrangements, and different time commuting system were most favored among construction workers, while the intensive work system was most favored by them as a method to complement the reduction in workload due to the reduced working hours. Therefore, it is expected that the findings of this study can be used as necessary data to establish a suitable method for future policy-making from the viewpoint of both the government and corporations.

목차

Abstract
1. 서론
1.1 연구배경 및 목적
1.2 연구범위 및 방법
1.3 기존연구
2. 근로시간 단축 개요 및 국내외 시행사례
2.1 법정근로시간 단축 개요
2.2 법정근로시간 단축제도의 국내외 시행사례
3. 건축기술자의 근로실태 변화 분석
3.1 설문개요
3.2 건축기술자의 근로실태 변화 분석
3.3 근로시간 단축에 따른 기업별 대응 실태 분석
4. 건축기술자의 요구사항 분석
4.1 근로시간 단축 요구사항
4.2 근로시간 단축에 따른 업무량 감소 보완방안 분석
5. 결론
REFERENCES

저자정보

  • 김재엽 Kim, Jae-Yeob. 한국교통대학교 건축학부 교수, 공학박사
  • 임형은 Lim, Hyeong-Eun. 한국교통대학교 건축공학과 석사과정
  • 김백중 Kim, Baek-Joong. 서정대학교 소방안전관리과 조교수, 공학박사