Development of ITB Risk Mgt. Model Based on AI in Bidding Phase for Oversea EPC Projects
초록
영어
EPC companies to continue operating overseas, it is increasingly becoming apparent that risk is no longer something to be avoided but a subject to be managed. During the bidding stage, the requirements, specifications and project line items within the bid package must be studied in details to analyze the various risk factors in order to avoid cost overruns. However, reviewing vast quantities of bidding documents is time consuming and labor intensive and is not an easy task and this is where automated information technology can help. For this study, I have constructed an ITB analysis model based on Watson AI that can analyze and apply vast amount of documents more effectively in a short time. Configuration of the Watson Explorer AI architecture for AI-based ITB risk management model research, the selection of learning procedures and analysis subjects, and the performance evaluation criteria were defined, and a test bed was constructed to conduct a pilot research. Consequently, I verified the effectiveness of the analytical time reduction and the quality of its results and VOC operations by professionals.
한국어
EPC 회사들이 해외에서 계속 사업을 운영하기 위해서는 위험이 더 이상 피할 수있는 것이 아니라 관리 대상이된 다는 것이 점점 더 분명 해지고 있다. 입찰 단계에서 입찰 패키지 내의 요구 사항, 사양 및 프로젝트 광고 항목을 자세히 조사하여 비용 초과를 방지하기 위해 다양한 위험 요소를 분석해야한다. 그러나 막대한 양의 입찰 서류를 검토하는 것은 시간이 많이 걸리고 노동 집약적이며 쉬운 작업이 아니며 자동화 된 정보 기술이 도움이 될 수 있다. 이 연구에서는 짧은 시간에 방대한 양의 문서를보다 효과적으로 분석하고 적용 할 수있는 Watson AI 기반의 ITB 분석 모델을 구축하 였다. AI 기반 ITB 위험 관리 모델 연구, 학습 절차 및 분석 대상 선택, 성능 평가 기준을 위한 Watson Explorer AI 아키텍처의 구성을 정의하고 시험 연구를 수행하기위한 테스트 베드를 구축하였다. 결과적으로 분석 시간 단축의 효과와 전문가의 결과 및 VOC 운영 품질을 확인하였다.
목차
Abstract
Ⅰ. 서론
Ⅱ. 해외 EPC 사업의 Risk 고찰
1. 인공지능 개념 및 해외 EPC 적용 사례
2. 해외 EPC 사업의 Risk
3. Risk 관리 프로세스 모델
4. 입찰시 수주 실패 원인과 성공요소
5. ITB 분석 방법의 개선 필요성
Ⅲ. AI 기반의 ITB Risk 관리 모델
1. Risk 관리 모델 구축 개요
2. Watson AI 기반의 연구 아키텍처
3. 학습절차 및 분석 주제 선정
4. 연구결과의 효과성 검증
Ⅵ. 결론
References