earticle

논문검색

건설공사 공종별 위험성평가 위험요인 도출 수준 향상을 위한 PCRA 모델 제안 - 건축공사 중심으로 -

원문정보

Construction Work by Type Risk Factors increased levels proposed model for the PCRA(Pre Construction Risk Assessment) - Focusing on building construction -

복훈, 김형태, 강경식, 양광모

피인용수 : 0(자료제공 : 네이버학술정보)

초록

영어

Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.

목차

Abstract
1. 서론
1.1 연구배경 및 필요성
1.2 연구목적
1.3 연구방법
2. 선행 연구
2.1 2012년 건설 재해자수 현황
2.2 2012년도 건설공사 사망재해 분석
2.3 2012년 건설분야 사망재해 원인과 위험성평가와의 연관성 설문조사
2.4 위험성평가 실시여부 및 위험요인 도출수준 실태 조사
2.5 선행연구 결과
3. 본 연구
3.1 시공발표회(PCM)을 통한 위험요인 도출 필요성
3.2 공종별 위험성평가 위험요인 도출수준 향상을 위한 PCRA 모델개발
4. 결론
5. 참고문헌

저자정보

  • 복훈 한경S&C
  • 김형태 한경S&C
  • 강경식 명지대학교 산업경영공학과
  • 양광모 유한대학교 산업경영과

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 기관로그인 시 무료 이용이 가능합니다.

      • 5,700원

      0개의 논문이 장바구니에 담겼습니다.