earticle

논문검색

BSC와 CSF 적용 활동기준 원가에 의한 IT투자관리

원문정보

IT Investment Management with ABC/M, BSC and CSF

육윤복, 신동익

한국EA학회 정보화연구 제8권 2호 2011.06 pp.93-108
피인용수 : 0(자료제공 : 네이버학술정보)

초록

영어

IT investment analysis usually proceeds by comparing benefits and costs of an IT investment. Most studies related to IT investment decision making typically focus on identifying types of benefits and developing ways of quantifying such benefits. The study, on the contrary, raises the question whether correct and valid cost estimation be made for IT investment decision making. Traditional cost system is argued not a valid way of estimating correct cost, henceforth we propose using activity-based cost method for the estimation of IT investment cost. Furthermore. we relate ABC with other management methods such as VCA, PRM, CSF, ABM to show the impact of IT investment on value chain. This integrated mechanism provides line-of-sight of IT investment, and thus leads to eliminate ambiguity embedded in IT investment decision making.

한국어

IT투자 의사결정은 비용과 효익을 대비하여 이루어진다. IT투자의사결정 관련된 많은 연구가 효익 분석의 어려움을 인지하고, 어떻게 효익을 식별하고 계량화 할 것인가 하는 문제를 다루었다. 그 러나 본 연구는 이런 기존 연구와 다르게 비용 측면에 초점을 맞추고 있다. 즉 기존의 전통적인 원가 계산시스템을 이용해서 산정한 IT투자 비용은 크게 왜곡될 수 있으므로 좀 더 정밀한 방법에 의한 비 용산정이 이루어져야 함을 지적한다. 본 연구는 이를 위해 활동원가(ABC) 방법의 적용을 제안하고, 여기에 ABM, VCA, PRM, CSF 등의 방법을 연계하여, IT투자 분석과 평가에서 IT투자가 미치는 영 향이 기업의 가치사슬에서 어떻게 영향을 미치는가 하는 연관관계를 면밀하게 분석하는 메카니즘을 제안한다. 이런 메카니즘을 통해서 IT투자의사결정에서의 모호성을 크게 배제할 수 있을 것이다.

목차

요약
Abstract
1. 서론
2. 이론적 배경
2.1 관리적 의사결정에서의 전통적 원가계산의 한계
2.2 BSC(Balanced Score Card)
2.3 가치창출분야(Value Creation Area: VCA)와CSF
2.4 Activity-Based Costing(ABC)
2.5 ABM(Activity-based Management)
2.6 BSC와 ABC시스템을 연계한 IT투자분석 메카니즘
2.7 PRM기반 IT투자의 타당성 검토
3. BSC와 CSF 적용 활동기준원가에 의한IT투자관리
4. 결론
참고문헌

저자정보

  • 육윤복 Yun Bok Yuk. 홍익대학교 상경대학
  • 신동익 Dong Ik Shin. 홍익대학교 상경대학

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 기관로그인 시 무료 이용이 가능합니다.

      • 4,900원

      0개의 논문이 장바구니에 담겼습니다.