원문정보
A Study on Development Process Analysis of Transbay Program
초록
영어
In this study, we look at the background of the development for the Transbay Transit Center of the New Intermodal Transfer Center in the Transbay Program, recently held in San Francisco, and the neighborhood Station Area redevelopment, It is aimed directly at understanding the process characteristics of the Intermodal Transfer Center and the focus of the development. Based on this, the ultimate goal is to derive future detailed research subjects to present more specific research progress direction. Analyzing the purpose and characteristics of the Transbay Program development Prior to advancing the consideration of the transition process of the city related to the Transbay Transit Center site related transportation system in San Francisco I began with deriving the background problem of development. Based on this, the relevance between the initial planning process of the program and the composition of related bills for development was examined. At this time, we analyzed the analysis by dividing it into aspects for the balanced development of the Connectivity & Transfer aspect and Station Area. The main aims of Transbay Program development are summarized into sustainability via Connectivity & Transfer, TOD and Transit Hub, thereby deriving future research subjects.
목차
1. 서론
1.1 연구배경 및 목적
1.2 연구범위 및 방법
2. 트랜스베이 프로그램의 개요
3. 연구대상 분석
3.1 트랜스베이 트랜싯 센터 개발의 상황적 배경
3.2 트랜스베이 프로그램의 초기계획과 법률조성
4. 분석 종합
5. 결론
REFERENCES