원문정보
초록
영어
The very important problems in location and allocation of multi-plant with multi-objectives provided were as follows: First, determining of priority of goals was the most important problem of goal programming. Second, determining of priority of goals was absolute necessary in a multiple criteria involving multiple dimensions, multiple objectives and multiple attributes. In addition to, Pareto improvement, Kaldor welfare and Rawls difference principle were very important criteria in a determining priority of goals. Third, critical problems in the application of goal programming approach to the multi-plant location and allocation were that priorities were assigned most nearly to nearly to real situation and that goals were established to challenging level. Lastly, sensitivity analysis of priority offered optimal priority information in policy analysis. We have determined priority of goals actually by intuitionism with considered judgement and reflective equilibrium.
한국어
수요가 증가하여 시장이 공간적으로 확대됨에 따라 본사공장에서는 수요권역에 가까운 위치에 분공장의 신설이 필요하게 되었다. 생산기능의 공간적 분할로 분공장 간의 생산량 의 할당과 수송의 할당이 필요하게 되었고, 분공장별로 할당된 생산을 위해서는 생산의 3요소인 토지, 노동, 자본의 투입이 필요하게 되었다. 이와 같이 분공장의 생산물은 기업, 근로자, 국가, 소비자가 각자의 목적을 추구하기 위하여 생산물을 수단으로 결합하게 되면서 각각의 목적달성이 상호간에 협력 또는 상반관계에 놓이게 된다. 이러한 생산의 과정에서 결합된 다수의 이해관계인의 다수의 목적을 조절하고 결정하기 위하여, 다수 목적의 달성을 위한 의사결정방법으로 다목적(multi-goal) 계획기법에 의한 의사결정방법의 필요성이 제기되었다. 따라서 본 연구에서는 다목적 계획기법에 의한 분공장 입지결정을 연구의 대상으로 삼게 되었다. 연구과정에서는 다수 이해관계인의 목적들인 수송비 극소의 목표, 목표 조업도의 유지목표, 수요충족의 목표, 환경의 질 유지의 목표, 지가 성장잠재력의 목표, 목표 고용량 유지의 목표를 다차원적으로 접근하여 기업적 차원, 국가적 차원, 근로자 차원, 소비자 차원에서 다루었고, 다수인의 목적을 다루면서 목적의 우선순위결정이라는 심각한 문제에 부딪히게 되었다. 이 과정에서 우선순위(priority)와 근본적으로 관련되어 있는 롤스(Rawls, J.)의 평등의 원칙과 불평등의 원칙을 응용하였고, 파레토(Pareto, V.)의 효율성의 원칙을 응용하면서 연구를 진행하였다.
목차
Ⅰ. 서론
Ⅱ. 선행연구
1. 목표계획법의 개념
2. GP의 선행연구
Ⅲ. 다목적에 의한 GP 모형화
1. GP모형변수의 설정
2. 제약조건식
Ⅳ. 실증분석결과
1. 최적 해의 해석
2. 최적 해에 의한 기존 분공장의 입지타당성
Ⅴ. 결론
< 국문요약 >
<참고문헌>