Korean automobile industrial is in a difficult situation because of more competitive global market and lower demand. Therefore, domestic as well as global automobile manufacturers are making greater efforts in cost reduction to strengthen the competitiveness. According to statistical data, logistics cost in domestic manufacturers is higher than advanced countries. In this study, we developed program to effectively manage standard time of procurement logistics, and confirm based on A-automobile factory data. For the purpose, we develop the system which is possible to manage standard time as well as calculate man-hour. Program is not just for calculating and managing standard man-hour, scenarios analysis function will be added to calculate benefit while introduce logistics automated equipment. In this study we propose scenario using AGV instead of electric motor while move component. In the scenario analysis, job constitution is changed,and then we use system to compare the result. We can confirm standard man-hour is reduced from 22.3M/H to 14.3M/H. In future research, it is necessary scenario analysis function, and develop algorithm with realistic constraint condition.
목차
1. 서론
2. 이론적 배경
2.1 표준시간
2.2 MODAPTS기법
2.3 자동차 공장의 부품조달 물류
2.4 유사한 연구와 비교
3. 본론
3.1 자재조달 물류의 프로세스 및 작업
3.2 조달물류 표준시간
3.3 조립라인 자재 조달 물류의 공수관리시스템
4. 결론 및 향후 연구 과제
5. References