원문정보
The study on improving the regulation for industrial accident rate level assessment of construction companies
초록
영어
The regulation for industrial accident rate level assessment of construction companies was introduced to the construction industry in the Republic of Korea since 1993 and has brought positive outcome on industrial accidents reduction at construction work sites. There were considerable decrease of industrial accident ratio and enforcing of contrators' safety organizations from the beginning of the regulation for industrial accident rate level assessment. In spite of these positive outcomes, there were some negative effects such as contractors' shrinking accident reports to keep good accident ratios since these figures had a great impact on pre-qualification stage of bidding when general contractors were competing for new construction projects. In addition, Comprehensive evaluation bid system, which replaces the lowest price bid system is applied to government-ordered construction projects since 2016. Comprehensive evaluation bid system includes construction company's accident rate as one of the evaluation items and carries out with the industrial accident rate level assessment of construction companies at the same time. The regulations of two systems have been called for improvement to unify these different procedures and standards which have led business stakeholders to confusion for several years. This study aims to devote on lessening shrinking accident reports and to reduce the waste of business stakeholders through changing the regulation for industrial accident rate level assessment.
목차
1. 서론
1.1 연구 배경 및 목적
2. 연구방법
3. 산업재해발생률 산정‧평가 제도 고찰
3.1. 환산재해율 산정제도 성과 평가
3.2. 산업재해예방활동 평가
3.3. 입찰참가자격 사전심사(PQ)의 건설안전지표
3.4. 종합심사낙찰제의 건설안전 지표
4. 산업재해발생률 산정‧평가 기준 분석
4.1. 환산재해율 산정대상 건설업체 범위
4.2. 환산재해율 제도와 산업재해은폐
4.3. 업무상질병 재해자의 사업주책무 범위
4.4. 종합심사낙찰제의 재해율ᆞ사망만인율
5. 분석결과에 따른 제언
6. 결론
7. References