Building Information Modeling (BIM) is mainly being promoted and applied in civil and public building cost management, but it is seldom used in power construction industry. Electric power construction project involves many professionals and different types of buildings and structures. Coupled with Chinese specialized quantity calculation rules, these factors led to some obstacles encountered when it comes to the application of BIM. In this paper, a substation is used as the object of the study, Revit software is used to explore 5D modeling method and other problems related to cost. Especially, quantity statistics according to 2013 edition’s power quota rules is the most difficult, three solutions were provided and one particularly detailed. It can be concluded that as long as it achieves data transfer, BIM 5D technology can be used in the power construction industry and it will bring huge impact on power engineering cost.

목차

Abstract
 1. Introduction
 2. Literature Review
 3. Research Approach
 4. Project Description
 5. Family Library Construction
  5.1. Information-Integration
  5.2. Information-Processing
 6. Modeling Points
  6.1. Elevation and Axis N
  6.2. Main Building
  6.3. Main Structure
  6.4. Ancillary Buildings
 7. Quantity Statistics
  7.1. Door List
  7.2. Wall Quantity
 8. Data Transfer and Valuation
 9. Conclusion
 10. Future Work
 References

저자정보

  • Rui Liu School of Economic and Management, North China Electric Power University, Beijing, China
  • Xiaoqiang Hu School of Economic and Management, North China Electric Power University, Beijing, China

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 원문제공기관과의 협약기간이 종료되어 열람이 제한될 수 있습니다.

      0개의 논문이 장바구니에 담겼습니다.