earticle

논문검색

Improved Entropy-based Fuzzy Group Decision-making Model and Application in Earthquake Emergency Priority

초록

영어

Integration of Entropy and fuzzy group decision-making method was applied into the earthquake emergency priority problem and difficulty, which provided a practical and scientific assistant decision-making mode. Through the demonstration of index system and its hierarchy of earthquake emergency priority, fuzzy group decision-making was mapped into earthquake emergency, fuzzy decision-making matrix was erected for earthquake emergency priority, and the priority of earthquake emergency was determined with the Improved Entropy weights. Finally, example showed that model could present guidance for the earthquake emergency plans and local decision-making operations.

목차

Abstract
 1. Introduction
 2. Fuzzy Group Decision-making Model under Earthquake Emergency
  2.1. Decision-making Hierarchy under Earthquake Emergency
  2.2. Fuzzy Group Decision-making Mapping in the Earthquake Emergency
  2.3. Fuzzy Decision-making Matrix of the Earthquake Emergency Priority
 3. Improved Entropy-based Decision-making Model on Earthquake Emergency Priority
  3.1. Calculate the Weight of Priority Index under Earthquake Emergency
  3.2. Calculate the Weight of Priority Index under Improved Entropy Method
  3.3. Calculation on Priority of Earthquake Emergency
 4. Example and Application Analysis
 5. Conclusion
 Acknowledgements
 References

저자정보

  • Fengshan Wang College of Field Engineering, PLA University of Science and Technology, Nanjing Jiangsu 210007, China
  • Wanhong Zhu College of Field Engineering, PLA University of Science and Technology, Nanjing Jiangsu 210007, China
  • Houqing Lu College of Field Engineering, PLA University of Science and Technology, Nanjing Jiangsu 210007, China
  • Yan Cao College of Field Engineering, PLA University of Science and Technology, Nanjing Jiangsu 210007, China

참고문헌

자료제공 : 네이버학술정보

    ※ 원문제공기관과의 협약기간이 종료되어 열람이 제한될 수 있습니다.

    0개의 논문이 장바구니에 담겼습니다.