The current investment and management mode of power grid construction project is inadequate to the whole optimization, the overall process of the project has obvious time-phased, therefore, the paper strongly advocates to carry out life-cycle management in power grid construction project, and divides the construction project into five stages as preliminary planning, design and planning, construction and operation, scrap and disposal, and evaluate and control the cost of operating stage, investment benefit of decision stage, design stage management and risk of construction stage, and sets up performance evaluation model of power grid project, in order to provide certain practical significance for the establishment of life-cycle management mode of power grid enterprises.
목차
1. Introduction
2. Life-cycle Theory Basis
3. The Application of Life-cycle Management in Power Grid Construction
3.1. Calculation and Control of Operation Cost
3.2. The Investment Benefit Calculation of Decision-making Stage
3.3. Management Evaluation of Design Stage
3.4. Risk Assessment of Construction Stage
4. Performance Evaluation of Project Construction
5. Conclusion
References