원문정보
초록
영어
This project is to strengthen the competitiveness of ICT devices used in a big data system, which will require the support of information about how to establish infrastructure which will enable to develop and test a large scale of computing devices and a kernel SW. The purpose of this project is to build the research infrastructure for the high-speed big data processing devices and to obtain the kernel SWs and generic technology. The purpose of this study is to implement the feasibility analysis on this project. Therefore this study is using the AHP method which has established the specific analysis processes and can quickly confirm the validity of the project by calculating the weights of the evaluation criteria. As a result of this study, the comprehensive score by AHP analysis is 0.842 and it shows that the implementation of this project is feasible.
목차
1. Introduction
2. Analytic Hierarchy Process Method
3. Data Collection
3.1. Questionnaire Structure for Data Collection
3.2. Selection of Respondents
4. Feasibility Analysis using AHP
4.1. Hierarchy Analysis on each Evaluation Criterion
4.2. The Criteria Analysis in the First Level
4.3. The Criteria Analysis in the Second Level
4.4. The Third Level Criteria Analysis
4.5. Overall Hierarchical Criteria Weights
4.6. Decision whether to Implement the Project
5. Conclusion
Acknowledgement
References