earticle

논문검색

A Feasibility Study on the Research Infrastructure Projects for the High-Speed Big Data Processing Devices Using AHP

초록

영어

This project is to strengthen the competitiveness of ICT devices used in a big data system, which will require the support of information about how to establish infrastructure which will enable to develop and test a large scale of computing devices and a kernel SW. The purpose of this project is to build the research infrastructure for the high-speed big data processing devices and to obtain the kernel SWs and generic technology. The purpose of this study is to implement the feasibility analysis on this project. Therefore this study is using the AHP method which has established the specific analysis processes and can quickly confirm the validity of the project by calculating the weights of the evaluation criteria. As a result of this study, the comprehensive score by AHP analysis is 0.842 and it shows that the implementation of this project is feasible.

목차

Abstract
 1. Introduction
 2. Analytic Hierarchy Process Method
 3. Data Collection
  3.1. Questionnaire Structure for Data Collection
  3.2. Selection of Respondents
 4. Feasibility Analysis using AHP
  4.1. Hierarchy Analysis on each Evaluation Criterion
  4.2. The Criteria Analysis in the First Level
  4.3. The Criteria Analysis in the Second Level
  4.4. The Third Level Criteria Analysis
  4.5. Overall Hierarchical Criteria Weights
  4.6. Decision whether to Implement the Project
 5. Conclusion
 Acknowledgement
 References

저자정보

  • Dae Ho Kim Division of Service Management, Mokwon University, School of Social Science E-422, Doanbuk-ro 88, Seo-gu, Daejeon, Korea
  • Dongwook Kim Graduate School of Public Administration, Seoul National University 1 Gwanak-ro, Gwanak-gu, Seoul 151-742, Korea

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 원문제공기관과의 협약기간이 종료되어 열람이 제한될 수 있습니다.

      0개의 논문이 장바구니에 담겼습니다.