원문정보
초록
영어
Unlike in the conventional RC method, prefabricated houses are prefabricated in the form of unit modules at a factory and assembled at a site. At the site, a ratchet wrench or an electric impact wrench is used to assemble the unit modules; however, their work efficiency is low, and construction tools including wrenches can often cause hazards for workers. In this study, an improvement plan is proposed by analyzing the problems of the existing assembly tools to enable the safer and more efficient assembly of modules. Through a structural analysis of the improvement plan for the assembly tools, it was found that the potential maximum stress of the tools did not exceed the yield stress of the steel.
목차
1. Research background and objective
2. Research Methodology and Scope
3. Current State of Assembly Tools for Unit Modules
5. Performance Verification through a Nonlinear Structural Analysis
6. Conclusion
Acknowledgments
References