With the increase of voltage level and more and more secondary devices are located in field, the secondary circuit of substation is in a strong electromagnetic environment. Because the secondary circuit is affected by the interference of switch operations, there are many trip accidents happened in substations without any fault in recently years, which constitutes a serious threat to the power network and harms the safe operation of the electric power system. It is of great theoretical significance and practical value to study the Electromagnetic Compatibility problem of the transformer substations substation secondary circuit. In this paper, the abnormal phenomenon of one 110kV intelligent substation merging unit is described. And the reason of the abnormal phenomenon is analyzed. Firstly, the Electromagnetic Compatibility experiments specified by the IEC61000-4 standard are carried out. Furthermore, to verify the anti–interference performance of the merging unit, the Electromagnetic Compatibility experiments above the standard are carried out. The structure of merging unit is improved until the merging unit operates normally. Secondly, to quantitatively analyze the disturbance strength, the electromagnetic disturbance signal is recorded, and the characteristics of amplitude and time-frequency of the recorded signal are analyzed. Thirdly, the characteristics of the logged signal are compared to the IEC61000-4 standard. Finally, this paper puts forward some suggestions about improving the Electromagnetic Compatibility performance of merging unit.
목차
1. Introduction
2. Background
3. Processing Steps
3.1. First Step
3.2. Second Step
3.3. Third Step
3.4. Forth Step
4. Conclusion and Suggestion
4.1. Conclusions
4.2. Suggestions
References