earticle

논문검색

<학술연구>

페주물사에 함유된 철 입자 용융화를 통한 철 괴 생산에 관한 연구

원문정보

A study for Product of Iron Lump from Oxidized Iron contained from the Waste Foundry Sand through Melting

이정언

피인용수 : 0(자료제공 : 네이버학술정보)

초록

영어

The waste casting sands generated from foundry is about 4,000 tons/day and the great part of them is handled by the method of reclamation and just 10% of them is recycled as a sand. This study is to produce the iron lump of high quality material through melting iron particle which is obtained from thewaste casting sands. By using the high frequency inductive melting furnace after separating iron particle from casting sand by collision and vibrating classifier, iron lump is produced from melting iron particles. The iron lump of iron content of 96.95% is produced from iron particle of 68.05% through this process. It was investigated that the cost of iron lump is four times higher than the one of iron particle and to produce iron lump is worth to 325 won per kg against iron particle with considering the consumed power(electric energy). Therefore, to produce iron lump from waste casting sands is not only to be economical worth but also to strengthen the ground resources system.

목차

Abstract
 1. 서론
 2. 실험장치 및 방법
  2.1 실험장치 및 구성(Design Variables)
  2.2 실험방법
 3. 결과 및 분석
  3.1 철입자의 특성 분석
  3.2 용융 전후 성분 함량 분석 및 경제성 평가
 4. 결론
 References

저자정보

  • 이정언 Jung-Eon Lee. Member, Pusan National University

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 기관로그인 시 무료 이용이 가능합니다.

      • 4,000원

      0개의 논문이 장바구니에 담겼습니다.