Improvement method on ordering system of design phase VE
초록
영어
Since the domestic construction industry in Korea has been developed on quantity with oversea busniess expansion, the need of VE has been on the rise for minimizing construction and maintenance cost with improvement of quality and functionality. In response, Ministry of Land, Transport and Maritime Affairs made research report that includes pre-qualification and technical proposal required when ordering VE. This study examines the design VE of military facility construction, investigates the corresponding problems and addresses how to improve design VE through the order cases and survey. In addition, suggestions for improvement of contract method and qualification that helps contractor choose relevant company in more reasonable and precise way are described. So, this study may be neither applicable nor practical to some other government or civilian organizations because this focuses on order design VE from the military perspective. Nevertheless, such drawbacks are indispensible for profession and specialization in military organization since military organization serves for the nation and thus it is responsible for preventing national budget from being wasted. Finally, we hope that this study can contribute to developing the system of ordering design VE and constructing a higher level of military facilities.
목차
1. 서론
1.1 연구의 배경 및 목적
1.2 연구의 범위 및 방법
2. 예비적 고찰
2.1 설계VE용역발주 관련 연구현황
2.2 설계VE의 목적 및 필요성
2.3 국내 설계VE용역 발주제도
3. 군 시설공사 설계VE용역 집행
3.1 설계VE용역 예산확보
3.2 설계 VE용역 발주
3.3 설계VE용역 업무수행
4. 군시설공사 설계VE용역 발주의 문제점 분석
4.1 설계VE용역 발주공고현황
4.2 입찰참가자격 조건의 문제점
4.3 실적 및 지역에 의한 제한의 문제점
4.4 기술자 자격에 의한 제한의 문제점
5. 개선요구사항의 도출
5.1 설문조사의 개요
5.2 설문결과 요약
5.3 개선요구사항도출
6. 결론
참고문헌