Analysis of Scheduling Technique Applied by Medium-sized Construction Company in Busan
초록
영어
Although schedule management is widely known to construction companies as a direct indication of project management information system and systematization, most of studies in the area have been focused on either a specific technique for reducing dates or a method of schedule analysis. How such techniques and methods have been being used by medium-sized construction companies based in Busan, Korea were studied. Moreover, the results were compared to that of a previous research, which lead to a few solutions that the companies can improve their practices, namely ‘formal work procedure’, ‘organizing fully responsible division for schedule management’, and ‘running regular education program’.
목차
1. 서론
1.1 연구배경 및 목적
1.2 연구범위 및 방법
2. 선행연구고찰 및 공정관리
2.1 문헌연구
2.2 공정의 주요 관리요소
3. 공정 관리실태 조사 및 분석
3.1 조사개요
3.2 공정 관리수준 실태
3.3 공정 관리체계 실태
3.4 공정 관리전담 인력 실태
4. 기존 연구 사례와 비교 분석
4.1 개요 및 일반사항
4.2 공정 관리수준 비교
4.3 공정 관리체계 비교
4.4 공정 관리인력 비교
5. 부산지역 건설기업의 공정관리 문제점 및 개선방향
6. 결론
참고문헌