earticle

논문검색

Research on Management System Platform for Multi-Type Wind Turbine Simulation and Training

목차

Abstract
 1. Introduction
 2. Overview of Wind Power Industry
 3. Current Situation of Research on Simulation System
 4. The Content of the Research
  1) The Necessity and Feasibility of Constructing the Platform
  2) The Framework of Simulation Training Management Platform
 5. The Choice of System Simulation Software
 6. The Design of Multi-Type Wind Generator Integrated Simulation System
  6.1. ADS Data Interaction between GH BLADED and TWINCAT PLC [23]-[26].
  6.2. The ADS Protocol in the Application Layer Protocol of Network Communication TCP/IP, Communication More Convenient. [27]-[30]
  6.3. PC Virtual Machine
 7. Conclusion
 Acknowledgment
 References

저자정보

  • Chao Shan Shenyang Institute of Engineering, Shenyang, China
  • Linlin Gao Shenyang Institute of Engineering, Shenyang, China
  • Yan Liu Shenyang Institute of Engineering, Shenyang, China
  • Dan Ma Shenyang Institute of Engineering, Shenyang, China
  • Zhongqiang Ge Shenyang Institute of Engineering, Shenyang, China

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 원문제공기관과의 협약기간이 종료되어 열람이 제한될 수 있습니다.

      0개의 논문이 장바구니에 담겼습니다.