원문정보
초록
영어
This study is on the method of the guided missile test and evaluation based on the Reliability Growth Management in the research and development stage. The Guided Missile One-shot System is often the subject of disputes on the appropriateness of its test and evaluation process when misfiring occurs in the initial operation phase. In this paper, the Reliability Growth method is presented for the improvement of the guided missile test, instead of the Hit-Probability-oriented test. Though the results of the Development Test (DT) and the Operational Test (OT) of the guided missile have been accepted based on the hit probability test criteria, this paper analyzes the proper performance of the objective reliability analysis from the viewpoint of reliability. For the reliability tracking and projection, this paper analyzes the data with the Reliability Growth & Repairable System Data Analysis (RGA) software, which is being used for the Army Materials System Activity (AMSAA) of the US army. Finally, the guided missile test method was proposed according to the reliability growth management, and the additional study was presented.
한국어
본 연구는 연구개발단계에서 유도무기 시험평가를 신뢰성 성장 관리를 통해 수행 가능성을 연구한 것이다. One-Shot 체계인 유도무기가 개발자․제작자에 의해 생산․배치된 후 사용자인 군의 초기 운용과정에서 불명중되면 시험평가 방법의 적절성에 논란이 제기된다. 이에 따라 현재의 명중률 중심 시험평가를 보다 합리적으로 개선하기 위해 신뢰성 성장(Reliability Growth) 관점에서 수행하는 방안으로의 적용 가능성을 사례 분석을 통해 제안하였다. 신뢰성 성장 분석을 위해 현재 미육군에서 사용하고 있는 RGA(Reliability Growth & Repairable System Data Analysis) 프로그램을 사용하였다. 향후에는 적용 가능성 연구결과를 기반으로 유도무기 시험평가시 신뢰성 성장 관리모델 및 절차를 제시하고자 한다.
목차
Abstract
1. 서론
2. 국방연구개발 및 시험평가 고찰
3. 유도무기 신뢰성 성장시험 적용 모델
4. 유도무기 시험평가 사례별 신뢰성 성장분석
5. 결론 및 향후과제
참고문헌