Study on Very Fast Transient Overvoltage of Closing No-load China UHV Transmission Demonstration Project Jindongnan-Nanyang-Jingmen 1000 kV Transmission Lines

초록

영어

When the ultra high voltage (UHV) substation used the gas insulated switchgear (GIS) system to switch lines with capacitive current, the pre-breakdown and multiple reignition will occur between switching contacts. Because of discharge characteristics of SF6 and special structures of GIS system, the variations of the electromagnetic transient process and very fast transient overvoltage (VFTO) are very fast and extremely complex. The development process and characteristics of VFTO remain to be dealt with to seek effective suppression measures. The overvoltage of closing no-load long lines on GIS system is analyzed in detail. The simulation model of the very fast transient process of closing no-load long lines on UHV GIS system is established. The VFTO of closing no-load China UHV transmission demonstration project Jindongnan-Nanyang-Jingmen 1000 kV transmission lines is analyzed using electromagnetic transient simulation software ATP-EMTP. The VFTO of closing no-load long lines on UHV GIS system is simulated and calculated, when the system has no additional closing resistors and lightning arresters, additional single stage closing resistors, additional multistage closing resistors, lightning arresters in two terminals of lines, lightning arresters in two terminals and the middle of lines, and additional multistage closing resistors and lightning arresters in two terminals and the middle of lines. The simulation results show that the additional multistage closing resistors and lightning arresters in two terminals and the middle of lines can effectively restrain the VFTO of closing no-load long lines on UHV GIS system.

목차

Abstract
 1. Introduction
 2. GIS System Closing No-load Long Lines Overvoltage Analysis
 3. UHV GIS System Closing No-load Long Lines Very Fast Electromagnetic Transient Process Modeling
  3.1. Model Selection And Parameter Settings
  3.2. UHV GIS System Model
 4. The No-load Long Line Closing Voltage Simulation Calculation
 5. UHV GIS System No-load Long-term Closing Very Fast Transient Overvoltage Suppression Measures
 6. Conclusion
 Acknowledgements
 References

저자정보

  • Bo Ye Faculty of Electric Power Engineering, Kunming University of Science and Technology, Kunming 650500, China
  • Ming Li Faculty of Electric Power Engineering, Kunming University of Science and Technology, Kunming 650500, China
  • Biao Bai Puer Power Supply Bureau, Yunnan Power Grid Corporation, Puer 665000, China
  • Gefei Qiu Faculty of Electric Power Engineering, Kunming University of Science and Technology, Kunming 650500, China

참고문헌