Aimed at the real-time request of dynamic scheduling to product resource, an optimization method of parallel dynamic chain real-time available resources was put forward. Proceed from real-time tracing of resource information influencing scheduling task’s dynamic property, established a resource information’s real-time tracing back and optimization model, which used module and parallel process mechanism to different kinds of real-time traced back resource information. The mechanism processed global dynamic feedback tracing for every module and optimized available resources primarily, on this basis, graded the primary available resources and gave a real-time candidate resource set. Through one example of one gear production scheduling, the method’s validity was tested.
목차
1. Introduction
2. The Real-Time Tracing of Manufacture Resouce Information
3. The Level Optimization Strategy of Real-Time Available Resources
4. Establishment of the Resources Optimization Model
5. Analysis of Examples
6. Conclusion
Acknowledgments
References