터널 보링 머신 공법 구경별 지질조건에 따른 월굴진장 분석

원문정보

Analysis of Monthly Excavation Length Depending on Ground Condition and TBM Diameter

Choi, Jae Jin, Park, Hong Tae

피인용수 : 0(자료제공 : 네이버학술정보)

초록

영어

This study analyzed monthly excavation length and amount of time occupied by the work item based on drilling reports to record the entire work process of TBM tunnel site. TBM equipment( ø2.6m, ø3.0m. ø3.5m, ø3.8m) was developed by WIRTH company in Germany. In addition, This study analyzed rising expected monthly excavation length based on the lowest loss rate of operating shifts among the field of nine. Analysis results are confident to be a useful tool when Planning and Managing TBM method construction to the primary planning steps in the field similar to geological conditions and analyzed geological conditions.

한국어

본 연구는 독일의 WIRTH사에서 개발한 ø2.6m, ø3.0m. ø3.5m, ø3.8m TBM 장비로 굴진 한 TBM 공법 적용 터널 현장의 작업 전 과정을 수록한 굴진보고서를 근거로 작업 항목 별로 차지하는 소요시간을 통계화하여 월굴진장을 분석하였다. 또한, 분석된 9개 현장의 운영교대시간의 손실률을 비교해서 가장 낮은 현장을 기준으로 TBM 상승 예상 월굴진 장을 분석하였다. 이와 같이 분석된 결과는 향후 유사한 지질 조건의 현장에서 TBM 공 법을 적용하여 운영할 경우 기본계획수립단계에서 개적인 공사기간과 공사비의 추정 등 의 공사를 계획하고 관리하는데 유용한 도구로 활용할 수 있을 것이다.

목차

ABSTRACT
 1. 서론
 2. 기존 연구의 고찰 및 연구방법
  2.1 기존연구의 고찰
  2.2 연구방법
 3. TBM 운영 현장별 지질 현황
 4. TBM 구경별 굴진율 분석
  4.1 현장별 굴진율 분석
  4.2. TBM 구경별 월굴진장 분석
  4.3 TBM 상승 예상 월굴진장 분석
 5. 결론
 References

저자정보

  • Choi, Jae Jin Department of Civil Engineering, Kongju National University
  • Park, Hong Tae Department of Civil Engineering, Kongju National University

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 기관로그인 시 무료 이용이 가능합니다.

      • 4,000원

      0개의 논문이 장바구니에 담겼습니다.