earticle

논문검색

Proposal for Improve the Electrical Power Supply in Port Sudan Town

초록

영어

This study discusses the lack of electrical power generation at Port Sudan (Sudan) and suggests solution to this problem. Information on the existing power plant and the grid at the town was analyzed, in addition to estimation of the power demand on the current grid and its future expansion for ten years were made. Different economical measures such as annual, internal and external rate of return were taken and the economical feasibility is proven to be within standard prescribed measures.

목차

Abstract
 1. Introduction
 2. Power Consumption
 3. Estimation the Power Demand in the Future
  3.1 Estimation of the Expected Load
  3.2 Consumer’s Groups
 4. Classification of Proposed Power Plant
 5. Crude Oil as a Power Generation Fuel
 6. Economical Analysis
  6.1 Cost Analysis
  6.2 Annual Revenues of the Project
  6.3 Profit and Loss Account
  6.4 Financial Evaluation of the Project
  6.5 Internal Rate of Return (I.R.R)
  6.6 External rate of return (E.R.R)
 7. Cconclusion
 References

저자정보

  • Naeim Farouk Department of Mechanical Engineering, Faculty of Engineering, Red Sea University

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 원문제공기관과의 협약기간이 종료되어 열람이 제한될 수 있습니다.

      0개의 논문이 장바구니에 담겼습니다.