This study discusses the lack of electrical power generation at Port Sudan (Sudan) and suggests solution to this problem. Information on the existing power plant and the grid at the town was analyzed, in addition to estimation of the power demand on the current grid and its future expansion for ten years were made. Different economical measures such as annual, internal and external rate of return were taken and the economical feasibility is proven to be within standard prescribed measures.
목차
Abstract
1. Introduction
2. Power Consumption
3. Estimation the Power Demand in the Future
3.1 Estimation of the Expected Load
3.2 Consumer’s Groups
4. Classification of Proposed Power Plant
5. Crude Oil as a Power Generation Fuel
6. Economical Analysis
6.1 Cost Analysis
6.2 Annual Revenues of the Project
6.3 Profit and Loss Account
6.4 Financial Evaluation of the Project
6.5 Internal Rate of Return (I.R.R)
6.6 External rate of return (E.R.R)
7. Cconclusion
References
1. Introduction
2. Power Consumption
3. Estimation the Power Demand in the Future
3.1 Estimation of the Expected Load
3.2 Consumer’s Groups
4. Classification of Proposed Power Plant
5. Crude Oil as a Power Generation Fuel
6. Economical Analysis
6.1 Cost Analysis
6.2 Annual Revenues of the Project
6.3 Profit and Loss Account
6.4 Financial Evaluation of the Project
6.5 Internal Rate of Return (I.R.R)
6.6 External rate of return (E.R.R)
7. Cconclusion
References