원문정보
초록
영어
This study aims to create the U-City generation based on the future M2M technology, which has recently been evolved. To this end, we introduce the concept of ‘u-Riverfront’ along Sincheon River flowing through the center of Daegu to create the future urban waterfront space and propose a urban regeneration method through natural connection to the adjacent old towns. To achieve this ‘u-Riverfront’ considering city generation, first, we need to improve the facility management along the current riverside, since pedestrians are less accessible to this area in terms of connection with adjacent areas. Second, we need to induce the IT infrastructures to the public city planning facilities in order to build infrastructures for urban restoration and development projects. Third, we need to provide citizens who use this Sincheon River with various portal service, culture, amenity, and security to lead to a substantial activation of waterfront.
목차
1. Introduction
2. Study Scope
3. Theoretical Considerations
3.1. Development of Waterfront Space in Conjunction with Urban Restoration
3.2. Ecological River Development Project Directions in Sincheon River
4. Internal and International Case Analysis
4.1. 'U-Riverfront' Development Project in Conjunction with‘U-City’
4.2. Internal Case Analysis of U-City Test Bed
4.3. International Cases of U-City Test Bed
5. Current Status of a Targeted Area
5.1. Current Status of a Targeted Area
5.2. Major Management of ‘u-Riverfront’ and User Facilities
6. Service Model with Unmanned Sensor Robot Technology
6.1. Unmanned Sensor Robot System
6.2. U-Riverfront Service Model
7. U-Riverfront Management Area at Each Stage
7.1. 1st Area-Major Management Facilities and User Facilities in Sincheon Riverside Area
7.2. 2nd Area – Management Area for Sincheon Landscape Management Plan[10] [11]
7.3. 3rd Area-Adjacent City-related Development Project Area
8. Conclusions and Future Directions
8.1. Conclusion
8.2. Limitations and Research Directions
Acknowledgements
References