A Novel Learning Algorithm based on a Multi-Agent Structure for Solving Multi-Mode Resource-Constrained Project Scheduling Problem

원문정보

Omid Mirzaei, Mohammad-R. Akbarzadeh-T.

피인용수 : 0(자료제공 : 네이버학술정보)

초록

영어

The resource-constrained project scheduling problem (RCPSP) includes activities which have to be scheduled due to precedence and resource restrictions such that an objective is satisfied. There are several variants of this problem currently, and also different objectives are considered with regards to the specific applications. This paper tries to introduce a new multiagent learning algorithm (MALA) for solving the multi-mode resource-constrained project scheduling problem (MMRCPSP), in which the activities of the project can be performed in multiple execution modes. This work aims to minimize the total project duration which is referred to its makespan. The experimental results show that our method is a new one for this specific problem and can outperform other algorithms in different areas.

목차

Abstract
 I. INTRODUCTION
 II. PROBLEM DISCRIPTION AND MODEL
 III. MULTI-AGENT LEARNING ALGORITHM
 IV. EXPERIMENTAL RESULTS
 V. CONCLUSIONS AND FUTURE WORK
 REFERENCES
 BIOGRAPHIES

저자정보

  • Omid Mirzaei Department of Computer Engineering Islamic Azad University Mashhad, Iran
  • Mohammad-R. Akbarzadeh-T. Center of Excellence on Soft Computing and Intelligent Information Processing Ferdowsi University of Mashhad Mashhad, Iran

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 원문제공기관과의 협약기간이 종료되어 열람이 제한될 수 있습니다.

      0개의 논문이 장바구니에 담겼습니다.