원문정보
A Study on the prediction and application of charging to the Development of Large Scale Buildings in Incheon
초록
영어
In this study, the strengths and weaknesses of the prediction and application of charging to the development of large scale buildings in Incheon, some preconditions are discussed. Research results include, as a result of estimations based on the assumption that the system has existed since 1994, that the possible levy could be more than 17 billion won annually and the tax revenue of Incheon could increase more than 9 billion won annually. As a result of estimations considering the future development plans which are the 2025 Incheon General Plan and the Urban Regeneration Plan 2025 in Incheon, the possible levy will be more than 16 billion won annually and the tax revenue for Incheon will increase more than 9 billion won annually. In conclusion, in order to introduce the system of charging to the development of large scale buildings in Incheon, it is required to entrust some power about charging for the development of large scale buildings to city ordinances.
목차
1. 서론
2. 이론고찰 및 사례연구
2.1. 과밀부담금
2.2. 서울시 사례
3. 과밀부담금 징수규모 예측
3.1. 과밀부담금 부담 대상
3.2. 과밀부담금 산정기준
3.3. 과밀부담금 산정
3.4. 과밀부담금 추정
4. 과밀부담금 재원활용 방안
참고문헌