In this study it was analyzed comparatively manpower and current standard estimating to form work site of sharing form divided as plate-type, tower-type, mixed-type, and complex-type. Like this, provided manpower to form work site of outside wall and inside wall/slave according to each sharing form was shown lower compared with current standard estimating. But form work of stair/core was shown higher than site estimating value. The reason for this is that all jobs were accomplished by different team according to working area and there are many differences in labor skill level and wage payment method. Accordingly it is necessary to prepare tailored cost estimation method dependent on field characteristic and working condition rather than apply uniformly current standard estimating. And further additional research is necessary to be proceeded.
한국어
본 연구에서는 공동주택 골조의 거푸집공사를 대상으로 주동형태별(판상형, 탑상형, 혼합형, 복합형)로 분류하고, 작업인력(기능공)과 공사비 산정에 기준이 되는 표준품셈을 토대로 거푸집공사에 실제 투입되는 인력과 표준품셈에 소요되는 인력을 비교분석 하였다. 주동형태별로 외벽, 내벽/슬래브의 거푸집공사 현장 투입인력은 현행 표준품셈 대비 낮게 나타났다. 하지만, 계단/코어 부분의 거푸집공사는 현장실측값 보다 높게 나타났다. 이러한 원인은 작업부위에 따라 팀 중심으로 구성되어 작업이 이루어지며, 기능공의 숙련도 및 노임 지급방식에서도 많은 차이점을 보였다. 따라서 현행 표준품셈의 일률적인 적용방식 보다는 현장의 특성 및 작업환경을 고려한 맞춤식 품셈을 산정할 수 있는 방안이 마련되어야 할 필요성이 있으며, 향후 추가적인 연구가 지속적으로 수행되어야 할 것으로 판단된다.
목차
1. 서론
1.1 연구의 배경 및 목적
1.2 연구의 범위 및 방법
2. 공동주택의 정의 및 종류
2.1 공동주택의 정의
2.2 공동주택 주동형태별 종류
2.3 공동주택 주동형태별 현황 분석
3. 대상현장 연구
3.1 연구대상 현장개요
3.2 공동주택 대상현장의 조사 범위 및 방법
3.3 공동주택 거푸집공사에 미치는 영향요인 분석
4. 공동주택 거푸집공사의 시공프로세스 분석
4.1 공동주택 거푸집공사의 현장 투입인력 분석
4.2 공동주택 거푸집공사의 표준품셈과 현장 투입인력 비교ㆍ분석
4.3 공동주택 거푸집공사의 표준품셈과 현장 투입인력 비교ㆍ분석 결과
5. 결론