원문정보
A Study on the construction method changes of Jung Dong EWHA girls highschool’s Simpson Memorial hall
초록
영어
Jung-Dong is the main place where constructed lots of modern buildings in 19th century. EWHA Girls High School’s Simpson Memorial Hall has been changed many ways due to historical events. The construction method is different each period. The hall was built with bricks using masonry in 1915. West-side part of building was extention in 1922. East-side part of building was changed to concrete after Korean War (1950~1952). The part was changed again to bricks with H-beam to reinforce the building during 2009~2011. At the same time floor, windows, stairs and plan were also changed. These changes are represented most popular construction way at the period.
목차
II. 정동의 근대건축물
1. 정동(貞洞)의 장소성
2. 정동길에 면해 벽돌로 지어진 근대건축물(1890년-1930년)
3. 정동에 지어진 근대교육시설
III. 정동에 지어진 근대여성교육시설, 심슨기념관
1. 심슨기념관 연혁
2. 이화여고내 벽돌로 지어진 근대건축물
3. 심슨기념관의 원형복원과정 및 방법
IV. 심슨기념관 구축방법의 변화
1. 심슨기념관 건물변화
2. 시기별 구축방법의 변화
V. 맺음말
참고문헌
ABSTRACT